Exhibiting
American Data Centers Construction Forum
Oct 28–29, 2026 · Houston, TX

Your mission-critical data center could be valued like an office building.

Assessors apply generic schedules to 3-year GPU refreshes, redundant capacity and behind-the-meter power. As a result, data center assessments are often in excess of market value. Meet ITC Tax’s data center team in Houston and find out where your portfolio stands — before the next roll is certified.
Confidential. Deadline-aware. No pitch.

15–40%

Typical first-year reduction across data center portfolios

$6M

Annual savings, 40% reduction — multi-state developer

$3.3M

Savings, 34% reduction — global operator

43%

Average first-year reduction across all ITC clients
Results vary by jurisdiction, property type and documentation quality. Past outcomes do not guarantee future results.

Every build decision discussed in Houston shows up again on an assessment notice.

Behind-the-meter power

On-site generation is often assessed as 30-year real property instead of 7–15 year industrial equipment — and can be taxed twice when it interacts with the grid.

Construction in progress

Long-lead and owner-furnished equipment enters the tax base before it’s deployed — sometimes before it’s even on site. It shouldn’t be valued as in service.

GPU depreciation

AI accelerators run flat-out and turn over every 12–18 months. We support a 3-year economic life where most assessors still apply 5–7 year schedules.

Incentives before the announcement

Abatements, §151.359 sales tax exemptions and Chapter 312 agreements are won during site selection — not after the project is public.

Assessment models weren’t built for mission-critical data centers.

Two facilities of the same size can differ materially in value based on power, cooling, redundancy, refresh cadence and contracts. We value those differences using your data — not industry averages.
FactorTraditional assessmentData center reality
Equipment life10–15 year published schedules3–5 year refresh, faster with AI/GPU
Value driverSquare or MW footagePower density (kW/rack)
On-site powerReal property, 30 yearsIndustrial equipment, 7–15 years
RedundancyTaxed at full utilizationN+1 / 2N is a reliability requirement
WaterAssumed unlimitedA functional constraint in many markets
IntangiblesMinimal considerationMaterial, often embedded in cost

Six places data center assessments go wrong.

Standby capacity taxed as revenue

Generators, UPS and N+1 systems valued as if fully utilized.

Refresh cycles ignored

Servers on 3–5 year cycles depreciated like long-life assets.

MEP misclassified

Chillers, UPS and generators booked as real property instead of BPP.

CIP taxed as in service

Undeployed assets valued like operational property.

Tenant improvements counted twice

Common in colocation, where shared and tenant-owned assets overlap.

Power assets on outdated frameworks

BTM generation and storage assessed inconsistently, often excessively.

Building in Texas?Lock in incentives
during site selection.

§151.359

10–15 yr state sales tax exemption on electricity & equipment. $200M + 20 jobs.

§151.3595

Up to 20 yrs incl. local sales tax for $500M + 40 jobs.

Chapter 312

Local property tax abatements on new improvements, up to 10 yrs.

Texas Energy Fund

3% loans for 100 MW+ dispatchable generation in ERCOT.

Meet us

Mark S. Dzeda, CPA, CMI

Founder & CEO, ITC Tax · Founded in Dallas in 2003

“Mark and his team have been nothing but professional and loyal. They have provided us with significant assessment reductions in our taxable liability.”
— Client Controller

97%Success in negotiations

Your property tax value is negotiable when ITC Tax
is your negotiator.

Reserve time with our data center tax team.

Book a 20-minute conversation at the booth. Bring an assessment notice or a site you are evaluating — we will tell you what we see.

  1. Initial review — notices, renditions and classifications across jurisdictions.
  2. Clear findings — a short executive summary with estimated tax impact.
  3. Execution — filings, appeals, recoveries and negotiations, end to end.
  4. Ongoing optimization — valuations kept in step as you expand.
What's on your plate? (select any)
Preferred meeting time

Confidential. Submissions go directly to ITC Tax's data center team.

ITC Tax

Offices
Houston · Austin ·
Fort Worth · Midland–Odessa

Copyright © 2026. All rights reserved by ITC Tax. American Data Centers Construction Forum is organized by ALJ Group; ITC Tax is an exhibitor. Privacy Policy